Filename | Description | Type | Size | Uploaded |
---|---|---|---|---|
![]() |
Case study of a walkway installed at University Coventry Hospital | 3.18 MB | 18/02/2022 | |
![]() |
Case Study of Ysgol Rhys Prichard | 178 KB | 18/02/2022 | |
![]() |
Case study of Penketh South Primary | 1002 KB | 14/06/2022 | |
![]() |
Case Study of Liverpool Heart & Chest COVID-19 Testing Facility | 589 KB | 18/02/2022 | |
![]() |
Case study about the Bolted Glass Canopy installed at Trumpington Park Primary School | 1.58 MB | 10/05/2022 | |
![]() |
A case study of outside eating areas in an educational setting | 924 KB | 15/06/2022 | |
![]() |
A case study of a bespoke canopy installed at Manchester Central Mosque | 567 KB | 15/06/2022 | |
![]() |
A case study on a bespoke canopy installed at Springwood Primary School | 2.62 MB | 15/06/2022 | |
![]() |
A case study of roof glazing refurbishment at Wrexham General Station | 2.15 MB | 25/08/2022 | |
![]() |
A case study of roof glazing refurbishment at Royal Albert Edward Infirmary | 862 KB | 25/08/2022 | |
![]() |
A case study of roof glazing refurbishment at Woolston Sixth Form College | 1.04 MB | 25/08/2022 | |
![]() |
A case study of roof glazing refurbishment at Tunbridge Wells Station | 1.22 MB | 25/08/2022 | |
![]() |
A case study of roof glazing refurbishment at Kids Planet | 1.14 MB | 25/08/2022 | |
![]() |
A case study of roof glazing refurbishment at University Coventry Hospital | 3.18 MB | 25/08/2022 | |
![]() |
A case study of canopy installation at Green Lane SEN School | 2.61 MB | 03/10/2022 |