Filename | Description | Type | Size | Uploaded |
---|---|---|---|---|
![]() |
PDF Case Study of the walkway installation at Newmarket Hospital | 444 KB | 23/11/2023 | |
![]() |
A photo sheet showing our work with solid polycarbonate | 1.84 MB | 20/11/2023 | |
![]() |
Datasheet | 1.36 MB | 15/11/2023 | |
![]() |
Specification document | 19 KB | 18/10/2023 | |
![]() |
Specification document | 20 KB | 18/10/2023 | |
![]() |
Twinfix Newsletter - Connect 2023 in PDF format | 1.86 MB | 25/09/2023 | |
![]() |
PDF Version of the NBS Specification | 93 KB | 08/09/2023 | |
![]() |
PDF Version of the NBS Specification | 93 KB | 08/09/2023 | |
![]() |
PDF Version of the NBS Specification | 128 KB | 08/09/2023 | |
![]() |
Datasheet | 305 KB | 08/09/2023 | |
![]() |
Datasheet | 453 KB | 08/09/2023 | |
![]() |
Datasheet | 511 KB | 08/09/2023 | |
![]() |
PDF Case Study of the roof refurbishment at Kilmarnock Station | 1.15 MB | 26/04/2023 | |
![]() |
PDF Case Study of the canopy installed at The Martin High School | 2.64 MB | 31/03/2023 | |
![]() |
Twinfix Alu-Link-Panel System specification document | 109 KB | 09/03/2023 |