Filename | Description | Type | Size | Uploaded |
---|---|---|---|---|
Case Study - Woolston Sixth Form College.pdf | A case study of roof glazing refurbishment at Woolston Sixth Form College | 1.04 MB | 25/08/2022 | |
Case Study - Royal Albert Edward Infirmary.pdf | A case study of roof glazing refurbishment at Royal Albert Edward Infirmary | 862 KB | 25/08/2022 | |
Case-Study Cheltenham Crematorium.pdf | A case study of a canopy installation at Cheltenham Crematorium | 925 KB | 25/08/2022 | |
Case-Study-Sir-John-Moores.pdf | A case study of a canopy installation at Sir John Moores Primary School | 1.05 MB | 25/08/2022 | |
Multi-Link-Panel-Brochure.pdf | 463 KB | 25/08/2022 | ||
Case Study - Manchester Central Mosque.pdf | A case study of a bespoke canopy installed at Manchester Central Mosque | 567 KB | 15/06/2022 | |
Case Study - Springwood Primary School.pdf | A case study on a bespoke canopy installed at Springwood Primary School | 2.62 MB | 15/06/2022 | |
Case Study - Education - Outside Eating Areas.pdf | A case study of outside eating areas in an educational setting | 924 KB | 15/06/2022 | |
Case Study - Penketh South Primary.pdf | Case study of Penketh South Primary | 1002 KB | 14/06/2022 | |
Case-Study Pembroke Dock Station.pdf | A case study of Pembroke Dock Railway Station | 4.06 MB | 10/05/2022 | |
Case-Study Aberdeen Station.pdf | A case study of Aberdeen Station | 2.30 MB | 10/05/2022 | |
Rhyl Station Case Study.pdf | A case study of roof glazing refurbishment at Rhyl station | 2.17 MB | 10/05/2022 | |
Case Study - Trumpington.pdf | Case study about the Bolted Glass Canopy installed at Trumpington Park Primary School | 1.58 MB | 10/05/2022 | |
Case Study – Liverpool Heart & Chest COVID-19 Testing Facility.pdf | Case Study of Liverpool Heart & Chest COVID-19 Testing Facility | 589 KB | 18/02/2022 | |
Case Study - Ysgol Rhys Prichard.pdf | Case Study of Ysgol Rhys Prichard | 178 KB | 18/02/2022 |