Filename | Description | Type | Size | Uploaded |
---|---|---|---|---|
![]() |
A case study of roof glazing refurbishment at Wrexham General Station | 2.15 MB | 25/08/2022 | |
![]() |
A case study of the canopy installed at Silverstone Primary School | 892 KB | 25/08/2022 | |
![]() |
A case study of roof glazing refurbishment at University Coventry Hospital | 3.18 MB | 25/08/2022 | |
![]() |
A case study of roof glazing refurbishment at Kids Planet | 1.14 MB | 25/08/2022 | |
![]() |
A case study of roof glazing refurbishment at Tunbridge Wells Station | 1.22 MB | 25/08/2022 | |
![]() |
A case study of roof glazing refurbishment at Woolston Sixth Form College | 1.04 MB | 25/08/2022 | |
![]() |
A case study of roof glazing refurbishment at Royal Albert Edward Infirmary | 862 KB | 25/08/2022 | |
![]() |
A case study of a canopy installation at Cheltenham Crematorium | 925 KB | 25/08/2022 | |
![]() |
A case study of a canopy installation at Sir John Moores Primary School | 1.05 MB | 25/08/2022 | |
![]() |
463 KB | 25/08/2022 | ||
![]() |
A case study of a bespoke canopy installed at Manchester Central Mosque | 567 KB | 15/06/2022 | |
![]() |
A case study on a bespoke canopy installed at Springwood Primary School | 2.62 MB | 15/06/2022 | |
![]() |
A case study of outside eating areas in an educational setting | 924 KB | 15/06/2022 | |
![]() |
Case study of Penketh South Primary | 1002 KB | 14/06/2022 | |
![]() |
A case study of Pembroke Dock Railway Station | 4.06 MB | 10/05/2022 |