Filename | Description | Type | Size | Uploaded |
---|---|---|---|---|
![]() |
A case study of Aberdeen Station | 2.30 MB | 10/05/2022 | |
![]() |
A case study of roof glazing refurbishment at Rhyl station | 2.17 MB | 10/05/2022 | |
![]() |
Case study about the Bolted Glass Canopy installed at Trumpington Park Primary School | 1.58 MB | 10/05/2022 | |
![]() |
Case Study of Liverpool Heart & Chest COVID-19 Testing Facility | 589 KB | 18/02/2022 | |
![]() |
Case Study of Ysgol Rhys Prichard | 178 KB | 18/02/2022 | |
![]() |
Case study of a walkway installed at University Coventry Hospital | 3.18 MB | 18/02/2022 | |
![]() |
A photo sheet showing our work in the healthcare sector | 6.40 MB | 18/02/2022 | |
![]() |
A photo sheet showing some of our work with Brise Soleil | 2.49 MB | 18/02/2022 | |
![]() |
A photo sheet showing examples of our work with Vertical Glazing | 400 KB | 18/02/2022 | |
![]() |
A case study of roof glazing refurbishment at Gerrards Cross and Headstone lane | 3.68 MB | 17/01/2022 | |
![]() |
Twinfix Newsletter - Connect 2021 in PDF format | 1.03 MB | 16/12/2021 | |
![]() |
PDF Version of the NBS Specification | 94 KB | 23/07/2021 | |
![]() |
A Photo sheet showing examples of our work in the Rail sector | 3.50 MB | 19/05/2021 | |
![]() |
Twinfix Multi-Click Photo Sheet in PDF format | 3.68 MB | 19/05/2021 | |
![]() |
A case study of an installation ofTwinfix products at the Clatterbridge Centre, Liverpool. | 849 KB | 23/09/2020 |