Enhancing Outdoor Learning at Acre Hall Primary

Key Project Features

  • Client Acre Hall Primary School
  • Main Contractor TJM
  • Project Type Canopy
  • Sector Schools & Academies

Project Overview

Acre Hall Primary School in Urmston required a covered area directly adjacent to the classroom to enable outdoor learning and play in all weather conditions. This investment was designed to create a safe, practical environment that could be used year-round, supporting both teaching and recreational activities.

Twinfix was appointed to design, manufacture and install a free-standing mono-pitch canopy, along with supporting features to ensure durability, safety and ease of maintenance in a busy educational setting.

Twinfix's Role in Supporting Outdoor Learning and Play at Acre Hall Primary School

Working in partnership with Black Cat Building Consultancy and main contractor TJM, Twinfix delivered a tailored package that addressed both practical and aesthetic requirements.

The structure was finished in powder-coated aluminium (RAL 7016 anthracite grey) for a durable, contemporary appearance, with navy post protectors added to safeguard pupils in high-traffic areas. The canopy was glazed with Twinfix’s Multi-Link-Panel NF system using 16mm multi-wall polycarbonate, a solution that provides diffused daylight, UV protection, and compliance with non-fragile safety standards.

Installations of this kind often take place during term-time, and Twinfix’s team worked sensitively within the live school environment. All installers are DBS checked, ensuring compliance with safeguarding policies while minimising disruption to classroom activity.

Project Overview

  • Free-standing mono-pitch canopy

  • Multi-Link-Panel NF roofing system with 16mm multi-wall polycarbonate glazing

  • 4 access hatches to enable safe inspection and maintenance

  • 10 navy post protectors to enhance safety in high-traffic areas

  • Aluminium frame powder coated in RAL 7016 (anthracite grey) for durability and aesthetics

  • Installed safely and efficiently during the school term with minimal disruption

Outcome

The completed canopy and supporting features have created a functional and visually cohesive addition to Acre Hall Primary School.

Key Benefits Delivered:

  • Extended teaching and play space, usable in all weather

  • Improved safeguarding and durability in high-traffic areas

  • Reduced maintenance requirements with integrated access hatches

  • A modern, cohesive finish that complements the school environment

  • Safe, professional installation in line with safeguarding standards